HomeAccelerated Construction ProcessAbout Eastern NomadBuilding ProjectsFrequently Asked Questions
Auburn Public School Building Project
ACCELERATED CONSTRUCTION PROCESS


AUBURN PUBLIC SCHOOL

Project:
Auburn Public School Toilet Building
Client:
NSW Department of Education and Training
Description:
Design & Construction of:

• Male/Female toilet building with disabled access, shower area and baby change facilities.

The Eastern Nomad Difference:
The major benefit Eastern Nomad was able to provide was offsite building manufacture and the provision of temporary toilet buildings to replace the demolished old toilet building,  which enabled the school to continue to operate during construction.

Eastern Nomad designed the building to not only complement the existing school but to be relocated with a reduced footprint to maximise usable playground space.

The new modular building installation occurred during school holidays and was ready for use at the start of the new term.


Please call us to discuss this project or for more information on how we can work with you to complete your building project.


Eastern Nomad Buildings
(02) 9834 8585
(02) 9676 8176
374 Vardys Road
Kings Park NSW 2148
Eastern Nomad Group © 2011