This project was an instrumental part of the Government Building The Education Revolution (BER). The buildings finishes were very high quality to match or surpass existing in situ buildings throughout all of regional NSW and were all required within 12 months.
Sixty one high quality buildings were designed, constructed, delivered and installed on schedule totalling 16,800 square meters of floor space.
The two most important advantages of modular construction for the NSW Department of Services were speed of the roll out of buildings and quality of finished product.